Construction of One-Component Markings at Karting Track in Huangpu District, Guangzhou
 |
Construction Time:July 14, 2022
Construction Temperature:35℃
Construction Materials:SA002
Marking Process:High-Pressure Airless Spraying |
Construction Notes
The construction was carried out during the daytime, departing at 7:30 in the morning and finishing work at 5:00 in the evening.
Original Graco 3400 equipment was used, which is lightweight and easy to operate, with a full curing time of no more than 20 minutes.
The outdoor construction temperature was high during the daytime, which affected the atomization of the coating, so 2% thinner was added.
The equipment is lightweight and highly stable, producing marking lines with beautiful shapes.