Home > Engineering Cases > Airport Engineering > Harbin Taiping International Airport
Harbin Taiping International Airport

 Harbin Taiping International Airport

图片3.jpg





Construction Time:September 08, 2017


Construction Temperature:25℃


Construction Materials:SA002


Sprinkling Process:Surface-sprinkled Glass Beads

Construction Notes

The construction was carried out during the daytime with high temperature, resulting in a significantly shortened curing time. Attention should be paid to preventing curing risks.

The coating must be fully stirred before use, and the dosage of curing agent added to Component B shall be fine-tuned according to real-time feedback.

One-component reflective marking spraying and two-component sprayed marking lines were adopted, featuring beautiful line shape, high wear resistance and excellent reflective effect.

The retroreflection value was tested throughout the process for real-time quality inspection.

On-site Records

图片2.png

Harbin Taiping International Airport

 Harbin Taiping International Airport

图片3.jpg





Construction Time:September 08, 2017


Construction Temperature:25℃


Construction Materials:SA002


Sprinkling Process:Surface-sprinkled Glass Beads

Construction Notes

The construction was carried out during the daytime with high temperature, resulting in a significantly shortened curing time. Attention should be paid to preventing curing risks.

The coating must be fully stirred before use, and the dosage of curing agent added to Component B shall be fine-tuned according to real-time feedback.

One-component reflective marking spraying and two-component sprayed marking lines were adopted, featuring beautiful line shape, high wear resistance and excellent reflective effect.

The retroreflection value was tested throughout the process for real-time quality inspection.

On-site Records

图片2.png

Copyright © 2020 Sanwin Traffic Equipment Co., Ltd. 

All rights reserved. Yue ICP No. 11004500


Official Online

WeChat Official Account

   
 
X