Harbin Taiping International Airport
 |
Construction Time:September 08, 2017
Construction Temperature:25℃
Construction Materials:SA002
Sprinkling Process:Surface-sprinkled Glass Beads |
Construction Notes
The construction was carried out during the daytime with high temperature, resulting in a significantly shortened curing time. Attention should be paid to preventing curing risks.
The coating must be fully stirred before use, and the dosage of curing agent added to Component B shall be fine-tuned according to real-time feedback.
One-component reflective marking spraying and two-component sprayed marking lines were adopted, featuring beautiful line shape, high wear resistance and excellent reflective effect.
The retroreflection value was tested throughout the process for real-time quality inspection.
On-site Records
