Home > Engineering Cases > Highway Engineering > Two-Component Squeegee Marking Project of Yansong Expressway in Beijing
Two-Component Squeegee Marking Project of Yansong Expressway in Beijing

Two-Component Squeegee Marking Project of Yansong Expressway in Beijing


SW_2.jpg


Construction Time:October 15, 2018


Construction Temperature:15℃


Construction Materials:SP208


Sprinkling Process:Gravity Surface-sprinkled Glass Beads


Construction Notes

The construction was carried out at night, departing at 6:30 in the morning and finishing work at 5:00 in the evening.

Original Kikusui screeding hand cart from Japan was used, which featured beautiful line shape, low failure rate and high construction efficiency.

The ambient temperature was relatively low, so 1.5% curing agent was added.

8KG of internal mixed beads were added to each barrel of coating, making the line shape fuller and the surface-sprinkled glass beads settle well.

On-site Records

SW_00101 11).jpg

SW2211).jpg

Two-Component Squeegee Marking Project of Yansong Expressway in Beijing

Two-Component Squeegee Marking Project of Yansong Expressway in Beijing


SW_2.jpg


Construction Time:October 15, 2018


Construction Temperature:15℃


Construction Materials:SP208


Sprinkling Process:Gravity Surface-sprinkled Glass Beads


Construction Notes

The construction was carried out at night, departing at 6:30 in the morning and finishing work at 5:00 in the evening.

Original Kikusui screeding hand cart from Japan was used, which featured beautiful line shape, low failure rate and high construction efficiency.

The ambient temperature was relatively low, so 1.5% curing agent was added.

8KG of internal mixed beads were added to each barrel of coating, making the line shape fuller and the surface-sprinkled glass beads settle well.

On-site Records

SW_00101 11).jpg

SW2211).jpg

Copyright © 2020 Sanwin Traffic Equipment Co., Ltd. 

All rights reserved. Yue ICP No. 11004500


Official Online

WeChat Official Account

   
 
X